Step 4 Lower the ejector lever until it is latched. See (2) in Figure 2.
Step 5 Check whether the hard disk is installed successfully by observing the hard disk indicator
status. For details, see 2.3 Front Panel Indicators and Buttons.
----End
6.4.2 CPU
Installing a CPU
Step 1 Power off G530 V2. For details, see 3.1 Powering Off the Compute Node.
Step 2 Remove the G530 V2. For details, see 3.5 Removing a G530 V2.
Step 3 Place the G530 V2 onto the ESD floor.
Step 4 Remove the cover. For details, see Removing the Cover of a G530 V2.
Step 5 Determine the location for installing the CPU.
Figure 6-27 shows the numbering and locations of CPUs.
Figure 6-27 Numbering and locations of CPUs
Step 6 Take a spare CPU out of its ESD bag.
NOTE
CPUs on the same server must have the same BOM number.
Step 7 Install a CPU carrier.
1. Take the new CPU carrier out of its ESD bag.
FusionServer G5500 Server
User Guide
6 Optional Part Installation
Issue 02 (2017-12-15) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
145

Table of Contents

Other manuals for Huawei FusionServer G5500

Related product manuals