Figure 4-11 Incorrect operations
Step 3 Install the G560.
NOTE
Install filler modules in empty slots to avoid system alarms or performance deterioration.
1. Insert the G560 horizontally into the chassis. See (1) in Figure 4-12.
Figure 4-12 Installing the G560
2. Close the ejector levers on the G560. See (2) in Figure 4-12.
Step 4 Check the indicator status after the G560 is powered on.
For details, see 2.3 Front Panel Indicators and Buttons.
----End
FusionServer G5500 Server
User Guide
4 Setup
Issue 02 (2017-12-15) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
59