NOTE
Do not take out a G530 V2 from its ESD bag if you do not install it immediately.
Figure 4-19 Incorrect operations
Step 3 Install the G530 V2.
NOTE
Install filler modules in empty slots to avoid system alarms or performance deterioration.
1. Press the unlock button on the G530 V2. See (1) in Figure 4-20.
Figure 4-20 Install a G530 V2
2. Open the ejector lever on the G530 V2 completely. See (2) in Figure 4-20.
FusionServer G5500 Server
User Guide
4 Setup
Issue 02 (2017-12-15) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
64