Step 2 Remove the bae plates for the DC power cables.
Figure 5-14 Removing the bae plates for the DC power cables
Step 3
Connect the DC power cables.
● The screw assembly whose model is subject to the delivery should be tightened
according to the corresponding standard torque.
● Partially tighten the nuts of the DC power cables to a torque of 5 N·m when
securing the cables.
● The wiring terminal must be installed with heat-shrink tubing at the crimping
area of the cable conductor to ensure that the electrical clearance between the
conductors is greater than 20 mm.
● Lay out the DC power cables according to the design, route the cables to the
wiring positions on the corresponding switches, and label the cables.
● Tighten the nuts using the socket wrench with an extension rod. The length of the
extension rod is greater than 30 cm. Secure the screw assembly using an adjustable
wrench.
● After connecting the DC power cables, ensure that the OT terminals are properly
attached to and aligned with the copper bar, and that the DC power cables point
vertically downwards.