EasyManua.ls Logo

Huawei LUNA2000-2.0MWH Series - Installing Cables; Preparing Cables

Huawei LUNA2000-2.0MWH Series
264 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 Installing Cables
5.1 Preparing Cables
CA UTION
Select cables in compliance with local cable standards, especially the electrical
specications and application environment. The key factors include the rated
current, cable type, routing method, maximum expected line loss, rated
temperature, ambient temperature, thermal resistance, acidity, sedimentation, and
environmental protection requirements.
Table 5-1 Cable description
No.
Cable Type Conductor Cross-
Sectional Area
Range
Outer
Diameter
Termin
al
Source
1 DC
power
cable
Two-core
outdoor copper/
copper-clad
aluminum/
aluminum alloy
cable
LUNA2000-2.0M
WH-1HX: 240–
400 mm
2
LUNA2000-2.0M
WH-2HX: 70–185
mm
2
25–68 mm M12
OT/DT
termina
l
Prepared
by the
customer
Single-core
outdoor copper/
copper-clad
aluminum/
aluminum alloy
cable
LUNA2000-2.0M
WH-1HX: 185–
400 mm
2
LUNA2000-2.0M
WH-2HX: 50–185
mm
2
25–47 mm
LUNA2000-2.0MWH Series Smart String ESS
User Manual 5 Installing Cables
Issue 08 (2022-11-15) Copyright © Huawei Technologies Co., Ltd. 112

Table of Contents

Other manuals for Huawei LUNA2000-2.0MWH Series

Related product manuals