Figure 4-13 Installation process diagram
----End
4.3.3 Installing the Battery in the Extinguishant Control Panel
Prerequisites
● The extinguishant control panel has been congured and commissioned before
delivery. Non-professional personnel are prohibited from conguring the
extinguishant control panel without permission.
● Non-professional personnel are prohibited from operating the Write Enabler
button.
● In an outdoor scenario, you are advised to power on the extinguishant control
panel within 24 hours after unpacking. Otherwise, place it in a dry indoor
environment without corrosive gas.
● If a battery is damaged, contact your local oce.
● Determine the position of the Extinguishant Control Panel.
LUNA2000-2.0MWH Series Smart String ESS
User Manual 4 Installation
Issue 08 (2022-11-15) Copyright © Huawei Technologies Co., Ltd. 109