Figure 4-14 Position of the extinguishant control panel
(1) Position of keys (2) Position of the extinguishant control
panel
Procedure
Do not damage components in the extinguishant control panel during the
installation.
● Model: JB-QBL-QM210
a. Remove the key from above the extinguishant control panel.
b. Open the extinguishant control panel and remove the cover.
c. Install the battery and cover in the extinguishant control panel.
d. Connect battery cables to the extinguishant control panel.
Figure 4-15 Installing the battery in the extinguishant control panel
LUNA2000-2.0MWH Series Smart String ESS
User Manual 4 Installation
Issue 08 (2022-11-15) Copyright © Huawei Technologies Co., Ltd. 110