information will not be restored, but the VLANs, logical ports, and bonded
ports on the Ethernet interface module will be restored.
● If you replace an interface module that uses Fibre Channel protocol with one
that uses Ethernet protocol, the Fibre Channel port 
conguration information
will be deleted. If you replace the interface module again with one that uses
Fibre Channel protocol, the Fibre Channel port 
conguration information will
not be restored.
● If you want to use interface modules of dierent types, contact Huawei
technical support.
Tools and Materials
● ESD wrist strap
● ESD bag
● Label
Procedure
Step 1 Check status before replacement.
1. Check system status.
Start SmartKit and choose Home > Storage > Routine Maintenance >
Health Check. On the Health Check page, perform inspection as instructed.
For details, see 7.1.2 Checking System Status.
If any items fail the inspection, rectify the faults by performing the recommended
actions in the inspection reports. Ensure that all other parts except the parts to be
replaced are working properly.
2. Check the status of the parts to be replaced.
Start SmartKit and choose Home > Storage > Parts Replacement > Parts
Replacement. On the Parts Replacement page, click FRU Replacement.
Then complete the check before the replacement as prompted. For details, see
7.1.3 Replacing an FRU.
You can proceed to next steps only when all items pass the pre-replacement check
and the replacement page is displayed. If any item fails, rectify the fault as
prompted.
Step 2 Wear an ESD wrist strap.
Step 3 Check the status of the Power indicator/Hot Swap button on the interface module
to determine whether the interface module has been successfully powered o, as
shown in Figure 7-79.
● If the indicator is 
o, the interface module has been successfully powered o.
Proceed to Step 4.
OceanStor V5 Series
Parts Replacement 7 Replacing FRUs
Issue 15 (2019-12-30) Copyright © Huawei Technologies Co., Ltd. 226