13
Site PDU X (C13 outlets)
14
Site PDU Y (C13 outlets)
The
site PDUs X and Y (
13
and
14
) are powered from two independent power
sources.
In this example, only two redundant ac power switches are used, and each powers
one node in each I/O group. However, for maximum redundancy, use one
redundant ac power switch to power each node in the cluster.
Note: While this topic provides an example of the cable connections, it does not
indicate a preferred physical location for the components.
22 IBM System Storage SAN Volume Controller: Hardware Installation Guide
|
|
|
|
|
|
|
|
|
|