EasyManua.ls Logo

Inovance MD500-PLUS Series - Page 62

Inovance MD500-PLUS Series
173 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Unpacking and Transportation
‑61‑
Figure 3‑15 Unloading the cabinet from the pallet
2. Transport the cabinet with a crane whose carrying capacity is greater than the
cabinet weight.
3. Lift and move the AC drive using the auxiliary angle bars or auxiliary eye bolts at the
top the cabinet, with a relief height kept within 0.3 m.
4. Ensure that the cabinet has been locked before moving.
5. Ensure that the cabinet is held by people on the left and right sides when being
moved.

Table of Contents

Other manuals for Inovance MD500-PLUS Series

Related product manuals