48 i3/i4 Satellite Antenna System – Install and User Manual
CODE 101 : Communication between antenna and antenna control unit is tested.
If failed, check the power and data cable.
CODE 102 : AZ CW limit is tested.
If failed, check the limit sensors, motor ,and belt for AZ axis.
CODE 103 : AZ CCW limit is tested.
If failed, check the limit sensors, motor ,and belt for AZ axis.
CODE 104 : EL axis is tested.
If failed, check the limit sensors, motor ,and belt for EL axis.
CODE 105 : Sub-reflector is tested.
If failed, check the sub-reflector.
CODE 106 : LNB is tested.
If failed, check the LNB and control board.
CODE 107: Skew System tested.
If failed, check the control board, skew motor ,and skew sensor
CODE 108 : Antenna Input Power tested.
If failed, check the RF cable.
CODE 109 : ACU Power tested.
If failed, check the ACU power cable and Input DC power.
CODE 110 : IRD Power tested.
If failed, check the ACU to IRD cable and IRD power.
RESULT STATUS : ● is pass. Number is fail(●●3 ●●●●8 ●●). And ? Is Testing.