Goodrive300-19 series open loop vector inverter special for hosit Quick start-up
-11-
2.6 Basic commissioning
Complete the basic commissioning as followings before actual utilization:
1. Select the motor type, set correct motor parameters and select control mode of the inverter
according to the actual motor parameters.
2. Autotuning. If possible, de-coupled from the motor load to start dynamic autotuning. Or if not,
static autotuning is available.
3. Adjust the ACC/DEC time according to the actual running of the load.
4. Commission the device via jogging and check that the rotation direction is as required. If not,
change the rotation direction by changing the wiring of motor.
5. Set all control parameters and then operate.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the INVT Goodrive300-19 Series and is the answer not in the manual?

INVT Goodrive300-19 Series Specifications

General IconGeneral
BrandINVT
ModelGoodrive300-19 Series
CategoryInverter
LanguageEnglish

Related product manuals