EasyManua.ls Logo

Isuzu NKR 4J Series - Rocker Arm Shaft Assembly

Isuzu NKR 4J Series
406 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4JB1/4JB1T/4JB1TC/4JG2 – ENGINE 6A1 – 17
ROCKER ARM SHAFT ASSEMBLY
REMOVAL
Preparation:
Disconnect battery ground cable.
1. PCV Hose
2. Cylinder Head Cover
3. Rocker Arm Shaft Assembly
Loosen bolts and nuts of rocker shaft bracket by turns
and remove rocker shaft assembly.
INSTALLATION
3. Rocker Arm Shaft Assembly
Install rocker arm shaft with larger oil hole (φ4) to the
front of engine.
Align fixing bolt with nut of rocker arm shaft and
tighten fixing bolts to the specified torque.
Nm (kgm/lbft)
54 (5.5/40)
6A1-17-1.tif
6A1-17-2.tif
6A1-17-3.tif
Removal steps
1. PCV hose
2. Cylinder head cover
3. Rocker arm shaft Assembly
Installation steps
To install, follow the removal steps in
the reverse order.

Table of Contents

Related product manuals