EasyManua.ls Logo

Isuzu NKR 4J Series - Accelerator Control; Accelerator Control Cable

Isuzu NKR 4J Series
406 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6C - 58 ENGINE FUEL
ACCELERATOR CONTROL
ACCELERATOR CONTROL CABLE
REMOVAL
1. Adjust Nut
Loosen the adjust nut on the cable bracket mounted
on the inlet manifold.
2. Accelerator Control Wire (Injection Pump Side)
Remove the control wire from injection pump control
lever.
3. Accelerator Control Wire (Accelerator Pedal Side)
Remove the accelerator control wire from accelerator
pedal.
4. Accelerator Control Cable
Remove the cable clip from intake manifold duct.
Remove the cable clip from chassis frame.
Pull out the wire to the chassis side through the
grommet hole of the floor board, and remove the
control cable.
6C-57-1.tif

Table of Contents

Related product manuals