Page 7
ENGLISH
Jandy
®
, JXi
™
Gas-Fired Pool & Spa Heater
|
Installation & Operation Manual
3.2 Required Equipment
Please ensure that the following equipment is available to the installer at the time of installation.
3.2.1 Tools
Safety Eyewear Gloves
Phillips
Screwdriver
Flathead
Screwdriver
Pipe Wrench
Adjustable
Wrench
3/16 in Hex Key Channel Locks
Digital
Differential
Manometer
Voltage Meter PVC Pipe Cutter Power Drill Tape Measure
3.2.2 Materials Supplied by Installer
Please ensure that all materials used during the
installation are in accordance with local codes or the
authority having jurisdiction (AHJ) requirements. If you
have any questions regarding the materials that need to
be used during this installation please call the Zodiac
customer service center at 1-800-822-7933.
Indoor installations will require additional venting and
exhaust conversion materials which are outlined in detail
in Section 3.3.
NOTE: Required materials may differ from the materials listed. Be
suretoconrmwithalllocalandnationalcodesbeforebeginningthe
installation.
GAS SUPPLIES
ELECTRICAL
SUPPLIES
PLUMBING
SUPPLIES
Appropriately sized Gas
Piping (see Section 4.1)
120 or 240 VAC PVC Piping
Manual Gas Shut Off Valve
Conduit Elbow/
Conduit connector.
PVC Cement
Gas Union Flexible Conduit
PTFE(Teon
®)
Tape
Gas Pipe Cap Wire Nuts (3 ea.)
Leak Solution
1/16 in Hose “T”
1/8 in - 1/16 in Barbed
Adapter
1/16 in Flexible Hose