Table 20: Deployment Checklist (continued)
DatePerformed ByFor More InformationItem or Task
QFX5110 Rack Requirements
Rack Requirements for a QFX5100 Device
Cabinet Requirements for a QFX5100 Device
Rack Requirements for a QFX3600 or
QFX3600-I Device
Cabinet Requirements for a QFX3600 or
QFX3600-I Device
“Rack Requirements for a QFX3500 Device”
on page 51
“Cabinet Requirements for a QFX3500Device”
on page 52
Rack Requirements for EX4300 Switches
Cabinet Requirements for EX4300 Switches
Verify that your rack or cabinet meets
the minimum requirements for the
installation of the switch.
QFX5110 Clearance Requirements for Airflow
and Hardware Maintenance
Clearance Requirements for Airflow and
Hardware Maintenance for a QFX5100 Device
Clearance Requirements for Airflow and
Hardware Maintenance for a QFX3600 or
QFX3600-I Device
“Clearance Requirements for Airflow and
Hardware Maintenance for a QFX3500Device”
on page 53
Clearance Requirements for Airflow and
Hardware Maintenance for EX4300 Switches
Plan rack or cabinet location, including
required space clearances.
Secure the rack or cabinet to the floor
and building structure.
Cables
“Cable Specifications for QSFP+ and QSFP28
Transceivers” on page 60
“Cable Specifications for Console and
Management Connections for the QFX Series”
on page 62
Acquire cables and connectors:
•
Determine the number of cables
needed based on your planned
configuration.
•
Review the maximum distance
allowed for each cable. Choose the
length of cable based on the
distance between the hardware
components being connected.
Plan the cable routing and
management.
Copyright © 2017, Juniper Networks, Inc.50
QFX3500 Device Hardware Documentation