Table 12: Site Preparation Checklist for the SRX220 Services Gateway
Installation (continued)
NotesDate
Performed
ByAdditional InformationItem or Task
Rack Installation
“SRX220 Services
Gateway Rack
Requirements” on
page 32
•
Verify that your rack meets the
minimum requirements.
•
Plan the rack location, including
required space clearances.
•
Secure the rack to the floor and
building structure.
Cabinet Installation
“SRX220 Services
Gateway Cabinet
Requirements” on
page 31
•
Verify that your cabinet meets
the minimum requirements.
•
Plan the cabinet location,
including required space
clearances.
Wall Installation
“Preparing the SRX220
Services Gateway for
Wall-Mount Installation”
on page 54
•
Verify that the area selected
meets the minimum
requirements.
•
Verify that you have the required
hardware to proceed with the
installation.
Cables
“Interface Cable and Wire
Specifications for the
SRX220 Services
Gateway” on page 39
•
Acquire cables and connectors.
•
Review the maximum distance
allowed for each cable. Choose
the length of cable based on the
distance between the hardware
components being connected.
•
Plan the cable routing and
management.
Related
Documentation
SRX220 Services Gateway Specifications on page 29•
• General Site Guidelines for Installing the SRX220 Services Gateway on page 29
• Installation Overview for the SRX220 Services Gateway on page 45
• SRX220 Services Gateway Cabinet Requirements on page 31
• SRX220 Services Gateway Rack Requirements on page 32
• Clearance Requirements for Airflow and Hardware Maintenance of the SRX220 Services
Gateway on page 33