Site Preparation Checklist for the SRX3600 Services Gateway
The checklist in Table 15 on page 65 summarizes the tasks you need to perform when preparing a site for
services gateway installation.
Table 15: Site Preparation Checklist
Date
Performed
ByFor More Information ...Item or Task
“SRX3600 Services Gateway Environmental
Specifications” on page 64
Verify that environmental factors such as
temperature and humidity do not exceed
services gateway tolerances.
“SRX3600 Services Gateway Cabinet Size and
Clearance Requirements” on page 71 and
“SRX3600 Services Gateway Rack Size and
Strength Requirements” on page 67
Select the type of cabinet or rack.
“SRX3600 Services Gateway Cabinet Airflow
Requirements” on page 72
Plan rack or cabinet location, including
required space clearances.
“Connecting the SRX3600 Services Gateway to
the Building Structure” on page 69
If a rack is used, secure rack to floor and
building structure.
Acquire cables and connectors.
“Grounding the SRX3600 Services Gateway” on
page 139
Locate sites for connection of system
grounding.
Measure distance between external power
sources and services gateway installation
site.
“Calculating the Power Budget for Fiber-Optic
Cable for the SRX3600 Services Gateway” on
page 95 and “Calculating the Power Margin for
Fiber-Optic Cable for the SRX3600 Services
Gateway” on page 95
Calculate the optical power budget and
optical power margin.