No.
Item Reference picture/drawing Procedure
2-19
9
!
Sub-deck assembly <Removal>
1)Remove the 4 screws (S2) and pull out the assem-
bly.
<Attaching>
1)While sliding the control plate toward the left, at-
tach the sub-deck assembly.
Fig. 2-7-9
NOTE
⋅ Attach by aligning the phase holes of the
main deck assembly and control plate.
2)Clamp with 4 screws (S2).
10
@
Main brake (SUP) assembly,
#
Main brake (TU) assembly,
6
Sub-brake assembly
<Removal>
Main brake (SUP) (TU) assembly
1)Remove the spring by disengaging its ends from
the hooks (L10) (L11).
Sub-brake assembly
1)Remove the washer (W1).
2) Remove the spring by disengaging it from the hook
(L8).
<Attaching>
1)Reverse the removal procedure.
Fig. 2-7-10
13
12
11
(
L10
)
(
L11
)
(
L8
)
(
P4
)
(
P5
)
(
W1
)
6
(
P1
)
11
18
(
S2
)
15
(
S2
)
16
(
S2
)
17
(
S2
)
(
L11
)
The boss should fit into the hole.
Phase alignment
Control plate
2-18