EasyManua.ls Logo

JVC GY-DV500U - Page 57

JVC GY-DV500U
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
No.
Item Reference picture/drawing Procedure
2-26
19
Sub cam
ª
Arm gear 2 assembly,
º
Clutch lock lever assembly
<Removal>
1)Remove the screw (S2) and take out the sub cam .
As L19 is engaged at the rear of the main deck
assembly while the phase is aligned, deviate the
phase in the direction of the arrow before removal.
20. This checking should be done after completing the
switching point adjustment.
Fig. 2-7-19(a)
Fig. 2-7-19(b) Removing the Clutch Lock Lever
Assembly
º
Fig. 2-7-19(c) Attaching the Sub Cam
Align the phases of the arm gear 2 assembly
ª
and clutch lock lever assembly
º
, attach them by
fitting the boss into the cam groove below, and
clamp with the screw.
31
(
S2
)
40
38
(
L19
)
39
L19
40
Phase alignment
39
38
40
Phase
alignment
Phase
alignment
Phase
alignment
Boss
<Attaching>
1)Align the phase correctly by referring to Fig. 2-7-
19(c), then attach by reversing the removal proce-
dure.
2-25

Other manuals for JVC GY-DV500U

Related product manuals