Service ManualService Manual
Operating Lights marLEDOperating Lights marLED
®®
E9 / E9i / E15E9 / E9i / E15
V V 1.0 1.0 3333
6.16.1 Setup of the Control Electronics with MicrofuseSetup of the Control Electronics with Microfuse
The microfuses are located on locations (9) and (11).The microfuses are located on locations (9) and (11).
1 1 ConneConnection ction LE LE E9 E9 Field Field A A 6 6 – – x x – – 1111 MicroMicrofuse fuse 2 2 MasteMasterr
2 Co2 Connectnnection ion LE LE E15 E15 Field Field A A 7 Co7 Connectnnection ion LE LE E15 E15 Field Field B B 1212 DIP DIP SwitcSwitchh
3 3 – – x x – – 8 8 ConneConnectioction n LE LE E9 E9 Field Field B B 1313 ProgrProgrammiamming ng InterInterfaceface
4 4 ConneConnection ction for for operaoperating ting foil foil 9 9 MicroMicrofuse fuse 1 1 Slave Slave 1414 ConneConnection ction LE LE E15 E15 Field Field CC
5 5 Handle Handle Connection Connection 10 10 Cable Cable terminal terminal for for powerpower
supplysupply
See section 6.13.1See section 6.13.1
“Connections”, page “Connections”, page 49 for49 for
the configuration.the configuration.
1515 ConConnecnectiotion LE n LE E9 E9 FieField ld CC