EasyManua.ls Logo

KLS Martin marLED E9 - Inspection Protocol for Technical Safety Check

KLS Martin marLED E9
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
V V 1.0 1.0 8989
Service ManualService Manual
Operating Lights marLEDOperating Lights marLED
®®
E9 / E9i / E9 / E9i / E15E15
10.410.4 Inspection Protocol–Technical Safety CheckInspection Protocol–Technical Safety Check
Inspection Protocol–Technical Safety CheckInspection Protocol–Technical Safety Check
Underline as appropriate:Underline as appropriate:
marLEDmarLED
®®
E9 / E9i / E15, TFT, surgiCamE9 / E9i / E15, TFT, surgiCam
® digital® digital
single, double, triple, quadruple,single, double, triple, quadruple,
ceiling, wall, mobileceiling, wall, mobile
Extras:Extras:
Room Room / / OR OR No.: No.: Serial Serial No.:No.:
Customer: Company:Customer: Company:
1. 1. Checking Checking the the wall wall / / ceiling ceiling assembly assembly and and the the suspension suspension system system OK OK Not Not OK OK N N / / AA
a) Checking the wall / a) Checking the wall / ceiling assembly for stabilityceiling assembly for stability
b) Checking the suspension system for potential damageb) Checking the suspension system for potential damage
c) Checking the suspension system for proper functioningc) Checking the suspension system for proper functioning
2. 2. Checking Checking potential potential equalizatioequalization n / / protective protective conductor conductor (PE) (PE) resistance resistance N N / / AA
Light: internal resistance between PE main terminal (max. 0.3Light: internal resistance between PE main terminal (max. 0.3
))
and:and:
(See (See first-measfirst-measured ured value value recorded recorded in in Handover Handover Report) Report) OhmsOhms
3. Checking the light head3. Checking the light head
OOK K NNoot t OOKK N N / / AA
a) Checking the rating plate and warning labelsa) Checking the rating plate and warning labels
b) Function test b) Function test according to Operating Instructionsaccording to Operating Instructions
c) Checking the filter glass assemblyc) Checking the filter glass assembly
d) Checking the light fieldd) Checking the light field
Specified: Specified: Min.–Max. Min.–Max. Actual:Actual:
e)e)
Checking the lamp voltage at nominal load on the contact blockChecking the lamp voltage at nominal load on the contact block
Specified: Specified: Actual:Actual:
26–36 VDC26–36 VDC
Test equipment used (ID no.):Test equipment used (ID no.):
Comment:Comment:
Date / Date / signature:signature:
Operator Operator / / customer customer Inspector Inspector / / techniciantechnician

Table of Contents

Related product manuals