Service ManualService Manual
Operating Lights marLEDOperating Lights marLED
®®
E9 / E9i / E15E9 / E9i / E15
VV 1 01 0 7979
d) Checking the bolted connections on the d) Checking the bolted connections on the ceiling tubeceiling tube
••
Check all fixing nuts (4) for Check all fixing nuts (4) for secure fixation on the ceiling-tube bolts (tightening secure fixation on the ceiling-tube bolts (tightening torque:torque:
45 Nm).45 Nm).
Fig. Fig. 10-4 10-4 Checking Checking the the torques torques of of the the bolted bolted connectionconnections s of of the the ceiling ceiling tubetube
••
√√
To check the torques with which the nuts are tightened, the bolted connections must first beTo check the torques with which the nuts are tightened, the bolted connections must first be
relieved from the lever action of the suspension arms and light head(s).relieved from the lever action of the suspension arms and light head(s).
••
Rotate the tracking arm(s) (4) to the position shown in figure a), then check the torques ofRotate the tracking arm(s) (4) to the position shown in figure a), then check the torques of
the two nuts (1) and tighten the nuts with a torque of 45 Nm if necessary!the two nuts (1) and tighten the nuts with a torque of 45 Nm if necessary!
••
Rotate the tracking arm(s) (4) to the position shown in figure b), then check the torques ofRotate the tracking arm(s) (4) to the position shown in figure b), then check the torques of
the two nuts (2) and tighten the nuts with a torque of 45 Nm if necessary!the two nuts (2) and tighten the nuts with a torque of 45 Nm if necessary!
••
Rotate the tracking arm(s) (4) to the position shown in figure c), then check the torques ofRotate the tracking arm(s) (4) to the position shown in figure c), then check the torques of
the two nuts (3) and tighten the nuts with a torque of 45 Nm if necessary!the two nuts (3) and tighten the nuts with a torque of 45 Nm if necessary!
e) Checking the electric lines, connections and boardse) Checking the electric lines, connections and boards
••
Check all screwed and clipped Check all screwed and clipped connections of the electrical components (mains connection,connections of the electrical components (mains connection,
ASPS changeover assembly, etc.) for proper ASPS changeover assembly, etc.) for proper working condition and stability. Also, check allworking condition and stability. Also, check all
electric lines and boards for proper working order.electric lines and boards for proper working order.
••
√√
NOTICENOTICE