EasyManua.ls Logo

KSB Guard User Manual

KSB Guard
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
KSB Guard
For Use in Potentially Explosive Atmospheres
Installation/Operating Manual

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the KSB Guard and is the answer not in the manual?

KSB Guard Specifications

General IconGeneral
BrandKSB
ModelGuard
CategoryMeasuring Instruments
LanguageEnglish

Summary

Safety Information

Explosion Protection

Details information for operating in potentially explosive atmospheres (ATEX).

Explosion Protection Marking

Lists the ATEX markings for the sensor, transmission, and gateway units.

Explosion Protection Installation & Maintenance

Outlines special regulations for installation, commissioning, and maintenance of explosion-proof devices.

Transport, Storage, and Disposal

Product Description

Installation and Commissioning

Installation Procedures

Overview of the installation process for the KSB Guard system components.

Fitting the KSB Guard Gateway

Step-by-step instructions for physically installing the KSB Guard Gateway unit.

Connecting Gateway to Power Supply

Details the process and safety precautions for connecting the KSB Guard Gateway to the power supply.

Fitting Gateway Antennas

Step-by-step guide for connecting the sensor network and LTE antennas to the gateway.

Checking Gateway Signal Strength

Explains how to check and interpret the mobile network signal strength using LEDs.

Commissioning the KSB Guard Gateway

Describes the process of commissioning the gateway after power connection and its operating statuses.

Positioning the Transmission/Battery Unit

Introduces the Set-up mode to find an optimal position for the transmission and battery unit.

Assignment and Setup

Covers the assignment and setup process for the KSB Guard system.

Adding the Pump to the System

Guides the user through the process of adding a pump set in the KSB Guard app or web portal.

Commissioning and Start-up

Describes the final commissioning steps and initial operating modes.

Commissioning Procedure Steps

Details the exact steps for performing the commissioning procedure using the pushbutton.

Operation

Servicing and Maintenance

Replacing the Battery Pack

Detailed instructions and safety warnings for replacing the battery pack.

Replacing the Sensor Unit

Step-by-step instructions for replacing the sensor unit, including safety precautions.

Replacing the Transmission/Battery Unit

Instructions for replacing the transmission and battery unit, with explosion hazard warnings.

Replacing the KSB Guard Gateway

Steps for replacing the KSB Guard Gateway, including power disconnection and reconnection.

Dismantling

Trouble-shooting

KSB Guard Gateway Trouble-shooting

Provides a table of common errors, causes, and remedies for the KSB Guard Gateway.

Transmission/Battery/Sensor Unit Trouble-shooting

Provides a table of errors, causes, and remedies for the transmission and battery unit and sensor unit.

Commissioning Error Resolution

Lists errors, causes, and remedies specifically during the commissioning phase.

Operational Error Resolution

Lists errors, causes, and remedies that occur during normal operation.

Related product manuals