Venta 3030-3530-4030
46
7. - Putting into service
RN034AGB D
Seed Drill
7.3 Preparing the tractor
The machine adapts to tractors fitted with a 3 point
linkage category II
Conform use of the machine implies the tractor must
fulfill required mechanical, hydraulic and electric
conditions:
The tractor must be fitted with lower link
stabilizers
- Connect QUANTRON S-2 control box to the 39-
pin on the machines' wiring harness.
- Check state of connectors and wiring harnesses.
Check that the connectors are in a good
condition and clean.
The front axle load (1) must never, under any
circumstances, be less than 20% of the
tractor's unladen weight.
kg
lb
kg
lb
1