EasyManua.ls Logo

KUHN Venta 3030 - Unloading with an Overhead Crane; Unloading with a Forklift

KUHN Venta 3030
136 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6. - Machine delivery
Venta 3030-3530-4030
41
RN034AGB D
Seed Drill
6.2.1 Unloading with an overhead crane
6.2.2 Unloading with a forklift
- To unload, use 3 slings.
- Fit 2 slings on the front parking stands.
- Fix a sling to the center at the level of the square
tube of the platform (1).
• 70 mm square tube (2.75’’)
1
Each sling must have a length of at least L:
• L= 4.00 m (13’1’’)
Minimum capacity of the lifting system:
Minimum lift capacity: 2 t
- Insert the forks of the carriage into the casing of
the central holder.

Table of Contents