Venta 3030-3530-4030
82
9. - Instructions for work
RN034AGB D
Seed Drill
9.4.4 Adjusting the metering unit opening for
small seeds (Small grooves)
- Close the metering unit completely by turning
handle (1) until index (2) shows position 0 on the
graduated scale.
Carry out this adjustment with the hopper empty
and the stop valve shut off.
- Loosen and rotate latches (1).
- Place the ring (1) towards the inside of the
metering unit.
- Position the locks (2) in the grooves (3).