EasyManua.ls Logo

KUHN Venta 3030 - Adjustments in Working Position

KUHN Venta 3030
136 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9. - Instructions for work
Venta 3030-3530-4030
71
RN034AGB D
Seed Drill
9.3 Adjustments in working position
Before:
- Position the power harrow horizontally with
respect to the ground.
- Adjust the impulse wheel depth.
or
Hydraulic top link
- Completely remove the third hydraulic point from
the machine.
- Position the hopper using the hydraulic top link set
in the most horizontal position with regards to the
ground.
- Loosen counter nut (1).
- Turn rod (2) until the hopper is horizontal with
regards to the ground.
- Tighten checknut (1).
2
1
Mechanical top link
- Loosen nut (1).
- Rotate the mechanical top link and adjust length so
that the hopper is horizontal with regards to the
ground.
- Tighten nut (1).
1

Table of Contents

Related product manuals