Venta 3030-3530-4030
64
8. - Instructions for transport
RN034AGB D
Seed Drill
8.1.2 Pre-emergence markers (Optional
equipment)
- Fold the pre-emergence markers.
8.1.3 Radar arm (Optional equipment)
- Raise the radar arm.
8.1.4 Metering unit
8.1.5 Parallelogram linkage
- Insert the valve slide.
- Check:
• that ratchet handle (2) is well secured with lock
plate (1).
• The latch (3) is in central position.