EasyManua.ls Logo

KUHN Venta 3030 - The Tramlining; Putting the Machine into Work Position

KUHN Venta 3030
136 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Venta 3030-3530-4030
68
9. - Instructions for work
RN034AGB D
Seed Drill
Seeding of coulters
- Switch on the blower at the nominal speed.
- Launch pre-dosing in the calibration menu of the
terminal and check the correct distribution of the
seed under each seed part.
- Compare required and actual seed deposit depth.
9.1.2 The tramlining
- Setting the tramlining rhythm according to the
wheel track and the treatment width.
9.2 Putting the machine into work
position
From the transport position:
- Lower machine until blades are at H from the
ground:
• 100 mm (3.9’’) < H < 150 mm (5.9’’)
Regularly check that all seeding units seed,
especially at high application rates. Check the
seed drill after each refill.
An insufficient or excessive depth can impact the
emergence quality.
Before placing the machine in working
position:
Check that nobody is within the machine
pivoting area.
If there is someone, make sure the person
moves away.

Table of Contents