KARA_SRM_EN_1-0
w w w . l - a c o u s t i c s . c o m
57
5757
57
13. Put the flight-case lid on.
14. Separate the top SB18 (SB18#2 for example) from the SB18 below (SB18#1 for example) as follows:
a. Remove a T-BLP from an SB18#1 top link point.
b. Rotate the link arm up.
c. Lock the link arm in closed position by re-inserting the T-BLP into SB18#2.
d. Repeat this procedure until all four arms are locked in closed position.
Figure 64: Separating SB18#2 from SB18#1
15. Attach a dolly board to SB18#2 and remove SB18#2 from the rigging location.
16. Repeat steps 14 and 15 until all SB18 are separated from the array.