21
4: Installation
With the installation site properly prepared, you are ready to unpack and install the
equipment. This section covers how to:
Unpack and move the product
Install the product
Connect electrical service
Connect service utilities
Connect to an exhaust system (optional)
Arrange certification for the product
Unpacking
The following tools are required to unpack the equipment:
Box knife
#2 Phillips screwdriver
Two ½” wrenches
Pliers
Carpenter’s level
The following safety precautions must be followed by all personnel unpacking the
equipment.
Wear safety glasses
Wear gloves
No loose fitting clothes
Wear close-toed shoes
Follow safe-lifting practices (do NOT attempt to lift this product without
specialized lifting equipment certified to lift up to 1000 lbs.)