EasyManua.ls Logo

Leica Geosystems CTR20 - Operation; Equipment Setup and Pole Mounting

Leica Geosystems CTR20
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Operation
4.1 Equipment Setup
4.1.1 Setting up as a Post-Processing Base
The equipment setup described is used for static operations over markers.
The instrument can be programmed with the field controller before use which
can then be o
mitted from the setup.
T
he an
tenna is mounted directly using screw fitting. If using stub and
adapter, procedures can vary slightly.
When using the adapter and carrier, ensure that the antenna and the
adapter assembly slide down the full length of the carrier stub. An incor-
rectly mounted antenna will have a direct effect on the results.
If the instrument is left in the container during use in high temperatures, the
lid should be le
ft open. Refer to the User Manual for operating and storage
temperatures.
Use an external battery such as GEB371 to ensure operation for a full day.
002496_003
a
b
c
i
k
d
e
f
g
h
l
m
n
o
p
b
j
b
Use
Description
Equipment setup
Operation 31

Related product manuals