EasyManua.ls Logo

Lenze v200-C - Order of Installation

Lenze v200-C
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
Order of installation
68
Lenze • BA v200-C v800-.C • 1.1
4.3 Order of installation
Attention
The screws must be tightened to a torque of 0.5 Nm.
Note
Connection to the power supply via screw connection. In the event of additional earthing on
the earthing screw, use wire cross section with at least 2.5 mm².
4. Cut out recess in the switch board or switching cabinet door according to the installation
layout.

Table of Contents

Related product manuals