Installation
Order of installation
68
Lenze • BA v200-C v800-.C • 1.1
4.3 Order of installation
Attention
The screws must be tightened to a torque of 0.5 Nm.
Note
Connection to the power supply via screw connection. In the event of additional earthing on
the earthing screw, use wire cross section with at least 2.5 mm².
4. Cut out recess in the switch board or switching cabinet door according to the installation
layout.