6.1.5 Order of steps during commissioning
24 V device: insert cable for power supply with cable end sleeves into terminals and
connect earthing
Connect cable for serial / parallel data transmission and fasten the plugs to the sockets
Plug in all other required cables and secure against slipping out.
6.1.6 Check for operational readiness
Check the device for hidden damages caused by improper transport, incorrect
operation/storage conditions or improper use. If damages are found, immediately shut down
the device and protect it against unintentional start-up.