LINXON Operation | 6
LX218-Operating-Manual-en1-04-(1908) 63 / 90
1. Is the value equal to the value on the rating plate of the calibration leak? Change if
necessary!
2. Hold the sniffer line to the calibration leak.
3. Confirm this with START or with the button on the sniffer line.
Calibration sequence
The calibration runs through the following sequences:
Confirm the stability of the signal with the OK button.
Now the following prompt appears:
• Remove sniffer line from the calibration leak
• Confirm with OK or the button on the sniffer line
After the end of the calibration process, the result is displayed.