Lucent Technologies Lineage
®
2000 ECS/GPS Battery Plant J85500G-2
3 - 6 Engineering, Planning and Ordering Issue 6 May 1999
Reserve Capacity The customer’s service and maintenance strategy are important
in determining reserve time. The availability of back-up ac
power and accessibility of the site are usually the determining
factors in battery sizing. The risk and acceptability of loss of
service is another factor which will vary from application to
application.
Table 3-C lists reserve time practices which have been used in
some telecommunications applications where maintaining
power to the load is critical. The figures are not intended to be
guidelines except in the absence of any specified customer
practices.
Table 3-A: Initial Load Drain Information
Load Circuit List 1 (Amps) List 2 (Amps)
1
Battery Plant Total
Table 3-B: Anticipated Future Load Drain Information
Load Circuit List 1 (Amps) List 2 (Amps NC, C or A*
1
Battery Plant Total
*NC = No Change, C = Changed, A = Added

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lucent Technologies Lineage 2000 and is the answer not in the manual?

Lucent Technologies Lineage 2000 Specifications

General IconGeneral
BrandLucent Technologies
ModelLineage 2000
CategoryPower Supply
LanguageEnglish

Related product manuals