Lucent Technologies Lineage
®
2000 ECS/GPS Battery Plant J85500G-2
Issue 6 May 1999 Table of Contents - 3
Initial charge 4 - 6
Cable support and ground system 4 - 6
Controller and LVD set-up 4 - 6
AC wiring, rectifier installation & test 4 - 8
Load wiring 4 - 9
Battery connections, installation and test 4 - 10
Controller test 4 - 10
Load turn-up 4 - 11
Installation procedures for plant growth 4 - 11
Adding a load circuit 4 - 12
Installing thermal compensation unit in existing plant 4 - 13
Test Procedure 4 - 17
5 Maintenance
Controls and Indicators 5 - 1
CP5 Fuse Board LEDs and fuses 5 - 1
DC Circuit Breakers/Fuses 5 - 1
Troubleshooting 5 - 2
Open Distribution Breaker or Fuse 5 - 2
Red LVD OPEN LED Lit 5 - 3
Yellow LVD FAIL LED Lit 5 - 3
Repair and Replacement 5 - 4
Load Circuit Breaker or Fuse Replacement 5 - 4
LVD/R Contactor Replacement 5 - 5
LVD/Fuse Board (CP5) Replacement 5 - 6
Spare Parts 5 - 7
6 Product Warranty