6.0 Commissioning SunPower Drive
6.1. Safety instructions before commissioning
Please make sure that the charging station is correctly connected to the power supply.
Please make sure that the charging station is installed as required.
Please make sure that the charging station is powered-on during the commissioning
process.
Check whether the charging connector is twisted and whether cables, plugs and housings
are in good condition.