Maintaining the device
58
Perform the following steps:
1. Remove the sealing gaskets both on the left and right with
tweezers.
Figure 24 Removing the sealing gaskets
2. Install new gaskets with tweezers. Ensure that the top of gasket is
facing up as shown, and gaskets are seated securely and flatly.
Maintaining the waste container
The waste container is connected to the device through tubes.
To avoid liquid leakage and biological hazard, monitor the waste
container status frequently and empty it in time. Clean and disinfect
the waste container after it is emptied.
Empty the waste container when either of the following conditions
is met:
z
the waste level reaches two thirds of the maximum volume before
sequencing
z
the waste container icon turns to during sequencing
Perform the following steps:
1. Wear protective equipment.
2. Remove the lid without tubes from the waste container.