EasyManua.ls Logo

Mikro DPM380 - Page 3

Mikro DPM380
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BEFORE YOU BEGIN
Apply appropriate personal protective equipment and
follow safe electrical work practices.
NEVER work alone.
Turn-off all power supplying the power meter and the
equipment in which it is installed before working on it.
Always use a properly rated voltage sensing device to
confi rm that all power is off .
Before closing all covers and doors, carefully inspect the
work area for tools and objects that may have been left
inside the equipment.
NEVER bypass external fusing.
NEVER open circuit a CT; use the shorting block to short
circuit the leads of the CT before removing the connec-
tion from the power meter.
Before performing hi-pot testing on any equipment in
which the power meter is installed, disconnect all input
and output wires to the power meter. High voltage test-
ing may damage electronic components contained in
the power meter.
The power meter should be installed in a suitable electri-
cal enclosure.
Failure to follow this instruction may result in serious
injury.

Related product manuals