EasyManua.ls Logo

Mitsubishi Electric MELSEC iQ-R-R00CPU - Monitoring the Program

Mitsubishi Electric MELSEC iQ-R-R00CPU
1028 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
434
27 PROCEDURE FOR STARTING UP A REDUNDANT SYSTEM
27.7 Monitoring the Program
27.7 Monitoring the Program
Check the operation of a program on the engineering tool.
Change the connection destination with the engineering tool and check the operating status of the system A or B.
[Online] [Current Connection Destination]
For how to check the operation, refer to the following.
GX Works3 Operating Manual
1. Select a system in "Specify Redundant CPU" on the "Specify
Connection Destination Connection" window.
2. Click the [Connection Test] button to check whether the CPU
module of the selected system has been connected.

Table of Contents

Related product manuals