EasyManua.ls Logo

Mitsubishi Electric MELSEC iQ-R Series - Monitoring the Program

Mitsubishi Electric MELSEC iQ-R Series
760 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
68
5 PROCEDURE FOR STARTING UP A REDUNDANT SYSTEM
5.7 Monitoring the Program
5.7 Monitoring the Program
Check the operation of a program on the engineering tool.
Change the connection destination with the engineering tool and check the operating status of the system A or B.
[Online] [Current Connection Destination]
For how to check the operation, refer to the following.
GX Works3 Operating Manual
1. Select a system in "Specify Redundant CPU" on the "Specify
Connection Destination Connection" window.
2. Click the [Connection Test] button to check whether the CPU
module of the selected system has been connected.

Table of Contents

Other manuals for Mitsubishi Electric MELSEC iQ-R Series

Related product manuals