Installation
01/02 AWB8230-1413GB
42
h
Route the control and signal cables separately from the
mains and motor cables.
Figure 35: Crossover of signal and power cables
a Power cable: L1, L2, L3, U, V, W, L+, DC+, DC–, R0, T0
b Signal cables: H, O, OI, O2, L, FM, AM, AMI, 1 to 5, CM1, CM2,
P24, TH, K11, K12, K14, K23, K24, K33, K34
f 100
ba
efesotomasyon.com - Klockner Moeller - inverter