EasyManuals Logo

NEC Express 5800/R320c-E4 User Manual

NEC Express 5800/R320c-E4
177 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #156 background imageLoading...
Page #156 background image
1. Bundled Software for the Server
Express5800/R320c-E4, R320c-M4, R320d-E4, R320d-M4 Installation Guide (Windows Server 2008)
156
Chapter 2 Installing Bundled Software
Activity Log Entries
Icon
Text
Color
Severity Description
Green Success
Task completed without error
Black Pending
Task is in progress
Black Information
Task information, no action necessary
Black Warning
A problem that should be addressed, but will not block an upgrade
Red Error
A problem that must be corrected before continuing with upgrade
The status bar at the bottom of the window will indicate one of the following states for the current operation:
Status bar indication
Icon State Description
Busy A readiness check is in progress. Allow time for the task to complete.
Ready
The system meets the prerequisites for the Active Upgrade process. You
can proceed with the upgrade process by splitting the system.
Broken
One or more components in the system does not meet the prerequisites for
the Active Upgrade process. You must resolve the problem before you can
continue with the upgrade.
For more information about interpreting Active Upgrade status, see Chapter 2 (1.5.4 (9) Viewing Active Upgrade
Process Status).
Countermeasure
When readiness check finishes successfully
If the check is successful, you can click Split to proceed with splitting the system. See Chapter 2 (1.5.4 (2)
Splitting the System).
When readiness check fails
If one of the readiness tests fails, you must resolve the problem, then click Retry to run the readiness test
again. When the problem is resolved, you can click Split to proceed with splitting the system.
(2) Splitting the System
Splitting an Express5800/ft series system divides it into two independently-functioning systems: the Production
Side, which continues to run your applications, and the Upgrade Side, which you can safely upgrade.
Splitting the system:
Disables RDR mirroring between the internal disks in each CPU/IO module enclosure
Detach the Upgrade Side from system resources such as the network, any user-specific application data
disks, and any external PCI resources (such as an external storage).
Disables any user-specified applications and services on the Upgrade Side so they cannot restart if you
restart the operating system on the Upgrade Side.
You can split a system only if it meets the prerequisites for the Active Upgrade process and has passed the
readiness check.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NEC Express 5800/R320c-E4 and is the answer not in the manual?

NEC Express 5800/R320c-E4 Specifications

General IconGeneral
BrandNEC
ModelExpress 5800/R320c-E4
CategoryServer
LanguageEnglish

Related product manuals