EasyManuals Logo

NetApp HCI User Manual

NetApp HCI
363 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #60 background imageLoading...
Page #60 background image
There are left and right rails on the H610S and H615C. Position the screw hole towards the
bottom so that the H610S/H615C thumbscrew can secure the chassis to the rail.
Install the node/chassis
You install the H410C compute node and H410S storage node in a 2U, four-node chassis. For H610C, H615C,
and H610S, install the chassis/node directly onto the rails in the rack.
Starting with NetApp HCI 1.8, you can set up a storage cluster with two or three storage
nodes.
Remove all the packing material and wrapping from the unit. This prevents the nodes from
overheating and shutting down.
H410C and H410S nodes
H610C node/chassis
H610S and H615C node/chassis
H410C and H410S nodes
Steps
1. Install the H410C and H410S nodes in the chassis. Here is a rear-view example of a chassis with four
nodes installed:

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NetApp HCI and is the answer not in the manual?

NetApp HCI Specifications

General IconGeneral
Product TypeHyperconverged Infrastructure (HCI)
Data ServicesData protection, encryption
Connectivity10 GbE, 25 GbE, 40 GbE, 100 GbE
Hypervisor SupportVMware vSphere
Management NodeIncluded in the solution
Storage MediaSSD and HDD
Node TypesCompute nodes, storage nodes
Storage ProtocolsiSCSI
Data ReductionDeduplication, compression, thin provisioning
High AvailabilityBuilt-in redundancy

Related product manuals