EasyManua.ls Logo

NF DF 1906 - DF 1906 Performance Test Guide

Default Icon
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.5 Performance Test
DF1906
7-3
7.4 How to Check Version Number
The firmware version of the DF
1906 is displayed for several seconds in the lower right part at power
on.
The version number can also be read by USB remote control query command "*IDN?".
Remote Control via USB
"5. USB Interface"
7.5 Performance Test
A performance test is performed as part of preventative maintenance to prevent performance
deterioration of the DF
1906.
A performance test is conducted when necessary to verify performance during acceptance inspection,
periodic inspection, and after repair of the DF
1906.
If the specifications are not satisfied after a performance test, calibration or repair is required. Contact
NF Corporation or one of our agents.
Before a performance test, check the following points.
The voltage of the power line is 100 V to 240 V AC ±10%, however, 250 V or less
The ambient temperature is within 23±5.
The ambient humidity is within 20 to 70% RH.
No condensation.
Warming up for at least 2 hours.
Observe the following points when performing a performance test.
When use of a coaxial cable is specified, use a coaxial cable with a characteristic impedance of 50
Ω, with a thickness of RG-58A/U or more, with a length of 1 m or less, and with a BNC connector
on both ends.
When 50 Ω termination is specified, set the input of the measuring instrument to be connected to
50 Ω. If the input cannot be set to 50 Ω with your measuring instrument, attach a 50 Ω coaxial
terminator (feed-through terminator) to the input of your measuring instrument.
Before a performance test, initialize the settings and turn the output on.
Initialize Settings
"Clear Setting Memory" in "4.3.1 Setting Memory"

Table of Contents

Related product manuals