42-02-7223 C1 4-1
In This Section
This section describes final adjustments to, and complete final inspection of, the elevator sys-
tem. At this point, all steps in Sections 2 and 3 should have been completed.
• Learning the Floor Heights (see page 4-2).
• Verifying One-Floor Run Operation (see page 4-3).
• Reaching Contract Speed (System 12 SCR Drive) (see page 4-6).
• Reaching Contract Speed (Quattro DC Drive) (see page 4-10)
• Learning Normal & Emergency Terminal Limit Switches (see page 4-12).
• Synthetic Speed Calibration (System 12 SCR Drive) (see page 4-14).
• Feed Forward Gain Calibration (System 12 SCR Drive) (see page 4-15).
• Fine Tuning the Speed Regulator (Quattro DC Drive) (see page 4-16).
• Shaping the Speed Profile (see page 4-16).
• Controlling the Start of Car Motion (see page 4-20).
• Calibrating the Floor Offsets (see page 4-30).
• Adjusting Leveling and Final Stop (see page 4-33).
•Load Weigher Adjustment for Dispatching (see page 4-38).
• Pre-Start Sequence (see page 4-43).
• Calibration and Verification of Safety Functions (see page 4-49).
• Safety Tests (see page 4-52).
• Terminal Switch Faults (see page 4-61).
Final Adjustment