42-02-7223 C1 2-1
In This Section
This section provides the information you need to install iControl and get the elevator running
in Construction Mode:
• Machine Room Preparation (see page 2-4).
• Controller Cabinet Installation (see page 2-6).
• Equipment Grounding (see page 2-6).
• Check for Shorts to Ground (see page 2-7).
• AC Voltage Verification and Wiring (see page 2-8).
• Motor and Brake Wiring (see page 2-10).
• Tachometer or Encoder Installation (see page 2-11 or page 2-13)
• Safety String Wiring (see page 2-15).
• Applying Power (see page 2-16).
• LAN Connections (see page 2-17).
• Initial Parameter Settings (see page 2-17).
• Drive Startup (System 12 SCR Drive) (see page 2-23).
• Motor Field Calibration (System 12 SCR Drive) (see page 2-29).
• Running on Machine Room Inspection (System 12 SCR Drive) (see page 2-38).
• Drive Startup (Quattro DC Drive) (see page 2-47).
• Running on Machine Room Inspection (Quattro DC Drive) (see page 2-57).
Construction Mode