Gear units – Operating and Assembly Instructions
40 B 1000 en-4419
There may be a reduction in efficiency before the running-in period is complete.
Pos: 24 3 /Anlei tung en/G etrieb e/4. In betri ebna hme/Ch eckli ste [B 1000] @ 3\ mod_1369303360997_388.docx @ 71579 @ 2 @ 1
4.5 Checklist
Checklist
Subject of check
Date
checked:
Information
see Section
Is the vent plug activated or the pressure vent screwed in?
Does the required configuration conform with the actual
installation?
Are the external gear shaft forces within permitted limits (chain
tension)?
Is the torque support correctly fitted?
Are contact guards fitted to rotating components?
Is the automatic lubricant dispenser activated? 4.2
Is the cooling cover connected to the cooling circuit?
3.13
Pos: 24 8 /Anlei tung en/G etrieb e/5. In spekti on un d Wartu ng/5. Ins pekti on und Wartung @ 23\mod_1531828817835_388.docx @ 2434012 @ 1 @ 1